Xinyu Feihu: D355 and D273 Steel Pressurized Pipeline Single Plugging

On June 8, 2024, the professional construction team of Xinyu Feihu arrived at the site. After full preparation in the early stage, the 5 operators cooperated in strict accordance with the construction plan, and carried out a series of operating procedures such as pressure welding, hot tapping,