Shen’an Coalbed Methane Pipeline Double Double Plugging Relocation and Renovation to Reach “Zero” Leakage

On April 30, 2024, the relocation and renovation of the Shenmu Anping coalbed methane pipeline with double double plugging, implemented by Xinyu Feihu Pipeline Technical Equipment Co., Ltd., was successfully completed with “zero” leakage throughout the entire process.