Project Update 27.03.2024 – Valve Replacement

Project Update 27.03.2024 – Valve Replacement

On March 27, 2024, Xinyu Feihu carried out the project of D325*7 aviation kerosene pipeline single plugging to replace a valve with shutdown at Guangzhou Baiyun Airport. The pipeline design pressure was 6.3MPa, and the internal pressure during construction was 1.6MPa. The pipeline material was L360.